File inbox
0/9 menus ready

Upload once, use across tasks

Filled slots are shared. Green menu = required files are complete. Main analysis uses Run ready tasks.

Overview

Choose a task to run

HTML Portable No install

One webapp, several tasks

Conversion hub for weekly operational files.

Upload files once in the Inbox, then open a green menu. Copy the OA-Tools folder to a USB or shared folder and open it in any browser.

Active menus 9
01 Waiting for files

Power Database Converter

Take 18 selected columns from the weekly Power Database file (.xlsb / .xlsx), plus ran label from sitemapping.csv, then export a lighter converted file.

  • Upload the source file
  • Detect PDB - RAN sheet
  • Export compressed XLSX (smaller) or XLSB
Open menu
02 Waiting for files

P1 ANOD merge

Upload a ZIP or RAR of 2G / 4G / 5G Excel files, merge in memory, then export the merge CSV and 4G NAV < 100% sites.

  • Upload one or more daily ZIP/RAR files
  • Read 3 sheets in memory
  • Export CSV merge + site <100% + last 7 days stability
Open menu
03 Waiting for files

Incident extract

Upload the daily Incident file, split Site List Impact into one row per siteid, then export CSV.

  • Upload Excel daily Incident
  • Split Site List Impact into rows
  • Add siteid+date / snapshot / week / Month / year
Open menu
04 Waiting for files

POT extract

Upload the daily POT file, split LIST IMPACT into one row per siteid, then export CSV.

  • Upload Excel daily POT
  • Filter last Date, then split LIST IMPACT
  • Lookup fm office / mc / region / city / circle_id / ran label
Open menu
05 Waiting for files

Hourly NAV / LND

Calculate daily 4G NAV from hourly COO, then map LND to Incident, POT, and OPEN LTOA.

  • Upload 4 ZIP/CSV hourly circle
  • Upload Incident, POT, dan LTOA tracker
  • Export SUMMARY, site-hour, dan site NAV < 100%
Open menu
06 Waiting for files

Weekly NAV 7 days

Combine multiple WDBH 7Days files with sitemapping.csv into one row per site for the last 7 days, plus a weekly report.

  • Upload sitemapping.csv
  • Upload multiple W-YYYY-WW_Sitelevel_WDBH_7Days.csv
  • Export last 7 days, or the weekly Below 99 report
Open menu
07 Waiting for files

Command Center RCA

Take selected columns from the Master RCA Tracker sheet in the Command Center file, plus the snapshot date.

  • Upload CommCenter_Chronic_Master_Tracker_*.xlsb
  • Set Snapshot to the download date
  • Export selected columns as CSV
Open menu
08 Waiting for files

OWS Spare

Merge SPHS and SPMS from the OWS transaction file into one Ultimate table, then export XLSX.

  • Upload OWS transaction .xlsx
  • Map SPHS + SPMS into 16 Ultimate columns
  • Export one combined XLSX
Open menu
09 Waiting for files

NAV Performance

Upload a monthly ZIP/RAR of daily site-level WDBH, map each DATE to week from Tim Reference, join sitemapping, then export the selected weeks.

  • Upload ZIP / RAR / CSV (month accumulation)
  • Map DATE → week from Reference Time
  • Filter weeks, Re-analyze, export CSV + site profile
Open menu

Menu 01

Power Database Converter

18 PDB columns + ran label XLSB / XLSX

Upload source file

Weekly Power Database file in .xlsb or .xlsx format.

Drop the file here or click to browse Example: PowerDatabase_WK33K_15082026.xlsb

Waiting for a file to be uploaded.

Result preview

First 20 rows of the columns that will be exported.

No data yet. Upload a Power Database file to preview.

Menu 02 · P1 ANOD merge

P1 ANOD merge

2G + 4G + 5G ZIP / RAR to CSV

Upload archive files

Accepts one or more daily .zip / .rar files. Excel must have 2G, 4G, and 5G sheets. Upload up to 7 days for accurate last 7 days stability.

Drop ZIP / RAR here or click the button below to browse Multiple daily files are allowed. Raw Excel also works

Waiting for ZIP / RAR files.

P1 ANOD merge preview

First 20 rows of the merged 2G / 4G / 5G result. Export goes to CSV.

No data yet. Upload ZIP / RAR to preview the P1 ANOD merge.

Site 4G NAV < 100%

Second P1 ANOD output. Sites with 4G NAV COO below 100%. Without tickets: DOWN (NAV 0%) → CHRONIC (0% < NAV < 100%).

No result yet. Run the merge first to see 4G NAV < 100% sites.

Menu 03 · Incident extract

Extract Tracker Incident

1 TT → many sites CSV

Upload sitemapping.csv

Upload once. Used to refill CIRCLE, SUB REGION, MICRO CLUSTER, and KABUPATEN / KOTA.

Drop sitemapping.csv here or click the button below Join: Site List Impact = siteid

Upload daily Incident file

Daily Excel (.xlsx / .xlsb). The Raw Data sheet is exploded from Site List Impact (newline delimiter), same as Power Query split into rows.

Drop the Incident file here or click the button below to browse Example: Incident List 20 August 2026 Full Day.xlsx

Waiting for an Incident file.

Site impact preview

First 20 rows after the split. Date columns are filled from the snapshot date (Thursday–Wednesday week).

No data yet. Upload an Incident file to preview.

Menu 04 · POT extract

Extract Tracker POT

1 event → many sites v20260823c · weekx + aging hh:mm CSV

Upload sitemapping.csv

Upload once. Used to refill fm office, mc, region, city, circle_id, and ran label. Same cache as Incident. week comes from Reference Time (weekx), kept in memory.

Drop sitemapping.csv here or click the button below Join: LIST IMPACT = siteid
Reference Time.xlsx · built-in

Upload daily POT file

Daily Excel (.xlsx / .xlsb). The POT Summary sheet uses the date from the filename (ddmmyy). If that date is missing, it uses the latest date that has LIST IMPACT.

Drop the POT file here or click the button below to browse Example: DIOC POT Events Summary Report (24 hours)_(210826).xlsx

Waiting for a POT file.

Site impact preview

First 20 rows after the split. Geography is refilled from sitemapping.csv.

No data yet. Upload a POT file to preview.

Menu 05 · Hourly NAV / LND

4G NAV SUMMARY + ticket mapping

COO 4G KPI 99.70%

Upload sitemapping.csv

Upload once. Circle uses circle_id. ran label is added to every CSV. Same cache as Incident / POT.

Upload hourly files for 4 circles

ZIP or CSV hourly_availability_*. A 06:00 snapshot = 24 hours of D-1 + 5 hours of today. Only the 24 hours of D-1 are calculated.

Upload Incident, POT, and LTOA extracts

Incident & POT CSV / Excel. LTOA: ltoa_tracker_data_export_2026XXXX.xlsx — only Ticket Status = OPEN, siteid = Site ID, Technology 4G. Sites on that day's LTOA list use the full 24 hours of the NAV date and always win vs POT/Incident.

4G NAV SUMMARY

Ticket-attributed LND, unique on siteid + hour. If more than one category hits (Incident / POT / LTOA), the larger LND wins.

Site 4G NAV < 100%

All sites with 4G NAV below 100% that day, regardless of the 99.70% KPI gap. Order: LTOA / LTOA (new) → POT/Incident (largest LND) → DOWN (NAV 0%) → CHRONIC (the rest, including Potential and NAV 99.95%–<100%).

Menu 06 · Weekly NAV

WDBH last 7 days

Multiple week CSV 2G_YYYY_W*

Upload sitemapping.csv

Upload once. Fills site_name, fm office, mc, city, province, region, circle_id, site_istimewa, and ran label. Same cache as the other menus.

Drop sitemapping.csv here or click the button below Join: SITEID = siteid

Upload weekly NAV (WDBH 7Days)

Multiple weeks are allowed. Export 1 keeps the latest 7 calendar dates (can cross weeks). Export 2 is the weekly report: 2G_YYYY_W* / 4G_YYYY_W* for every uploaded week.

Drop WDBH files here W-YYYY-WW_Sitelevel_WDBH_7Days.csv Example: W-2026-30 through W-2026-33

Waiting for sitemapping.csv and WDBH files.

Last 7 days preview

One row per site. Last 7 days of NAV, weekly 2G/4G for every uploaded week, occurance below 99%, healthiness from the last 4 weeks, and last 7 days stability.

No result yet. Upload files, then analyze.

Menu 08 · OWS Spare

SPHS + SPMS combined

1 file → 1 table XLSX

Upload OWS transaction

Excel with sheet SPHS and/or SPMS. If both exist, they are combined into one Ultimate table. If only one exists, the other side stays blank.

Drop the OWS file here or click the button below to browse Example: OWS transaction 20260823.xlsx

Waiting for an OWS transaction file.

Ultimate preview

First 20 rows of the combined SPHS + SPMS table.

No data yet. Upload an OWS file to preview.

Menu 09 · NAV Performance

Month daily → selected weeks

ZIP / RAR / CSV week from Tim Reference

Upload daily site-level WDBH

Drop a monthly ZIP/RAR (or the CSV inside it). DATE is mapped to week from the built-in Reference Time. Site profile columns come from the built-in sitemapping.csv. Source WEEK is ignored.

Drop ZIP / RAR / CSV here or click the button below to browse Example: Sitelevel_WDBH_Daily_August_2026_with_5G_v2.rar
Reference Time.xlsx · built-in sitemapping.csv · built-in

Week filter

Analyze first to list weeks. Uncheck weeks you do not need, then Re-analyze and export.

No weeks yet

Waiting for a daily site-level ZIP / RAR / CSV.

Selected weeks preview

First 20 rows. WEEK comes from Tim Reference. DATE is dd-MMM-yy.

No result yet. Upload the monthly archive, pick weeks, then Re-analyze.

Menu 07 · Command Center

Master RCA Tracker extract

XLSB / XLSX 16 columns + snapshot

Upload Command Center tracker

Only the Master RCA Tracker sheet is read. Set Snapshot to the download date of the Command Center file.

Drop the Command Center file here or click the button below Example: CommCenter_Chronic_Master_Tracker_2026 (12).xlsb

Waiting for a Command Center file.

Result preview

First 20 rows of the selected columns.

No data yet. Upload a Command Center file to preview.
ASSURA help

Local FAQ · no API key

Processing file...